On Going Projects/Recently Completed

  • *

    N-55 Hakla (M-1) Yarak (D.I.Khan) Motorway Part of CPEC

  • *

    East Bay Expressway of Gwadar Port. A Project of China Pakistan Economic Corridor (CPEC)

  • *

    Quetta Western Bypass on National Highway, N 25 (23 Km)

  • *

    Jacobabad Water, Wastewater and Solid Waste Infrastructure

  • *

    Loweri Tunnel Project between Chitral and Dir, KPK Pakistan

  • *

    Bahria Town Karachi Interchange, AT M9

  • *

    CPHGC 2X660MW Coal Fired Power Plant Survey

  • *

    Wadi Al-Gahawer Road

  • *

    M-9 DHA City Karachi Interchange

  • *

    Moulvi Tamizuddin Khan (Urban Road) and Flyover

  • *

    Rural Roads Construction

  • *

    Feasibility Study For The Development Of Breakwater at Jabal-e-Nuh and Naval Basin At Gwadar Port

  • *

    Karachi Thatta 4-Lane Dual Carriageway

  • *

    Sehwan-Ratodero N-55

  • *

    Ring Road Faisalabad

  • *

    Karachi-Hyderabad Motorway M-9

  • *

    Greater Karachi Sewerage Plan S-III